Interested in learning about other DOE Funding Opportunities?

Notice

As required by court order, the Department of Energy is providing this Notice and Orders to all employees, contractors, and grantees.  Click Here to Read.

EERE Archived Funding Opportunities

Collapse Jump to an Announcement:
 
Announcement Number 
Announcement Title 
Announcement
Type
 
Program 
LOI Deadline 
CP Deadline 
FA Deadline 
 
xv
xv
xv
xv
xv
  DE-FOA-0002960 Large Wind Turbine Materials and Manufacturing Funding Opportunity Announcement (FOA) Advanced Materials and Manufacturing Technologies Office (AMMTO) 3/23/2023 05:00 PM ET 5/17/2023 05:00 PM ET

DE-FOA-0002960: Large Wind Turbine Materials and Manufacturing

Modification 0002 Announcement
Changes include updates to the submission deadlines on the cover page (Full Application and Replies to Reviewer Comments), as well as an update to the Expected Date for EERE Selection Notifications.  

Modification 0001 Announcement
Changes include updates to the following sections:
1) IV.D.xvii Transparency of Foreign Connections
2) Appendix C.2 Waiver for Performance of Work in the United States (Foreign Work Waiver)

This Funding Opportunity Announcement (FOA) is being issued by the Office of Energy Efficiency and Renewable Energy (EERE) on behalf of the Advanced Materials and Manufacturing Technologies Office (AMMTO). The goals of this FOA are to:

• Further develop broad, foundational, manufacturing “platform” technologies and address gaps and barriers that are currently limiting use of composite materials in clean energy and decarbonization-related applications with wind energy applications as the primary FOA focus;

• Enable additive manufacturing processes for rapid prototyping, tooling, fabrication, and testing of large wind blades;

• Apply additive manufacturing to non-blade wind turbine components; and

• Mature nascent technologies, processes, and methods that improve one or more aspects of advanced composites manufacturing, including automation, and sustainability (including recycling) of these materials.

EERE eXCHANGE is designed to enforce the deadlines specified in this FOA. The “Apply” and “Submit” buttons will automatically disable at the defined submission deadlines. Should applicants experience problems with EERE eXCHANGE, the following information may be helpful.

Applicants that experience issues with submission PRIOR to the FOA deadline: In the event that an applicant experiences technical difficulties with a submission, the applicant should contact the EERE eXCHANGE helpdesk for assistance (EERE-eXCHANGESupport@hq.doe.gov). The EERE eXCHANGE helpdesk and/or the EERE eXCHANGE system administrators will assist applicants in resolving issues.

Please see the full FOA in the DOCUMENTS section below.

Documents

  • Funding Opportunity Announcement (Modification 0002) (Last Updated: 4/25/2023 03:09 PM ET)
  • Q&A Spreadsheet (Large Wind Turbine Materials and Manufacturing) (Last Updated: 6/7/2023 10:51 PM ET)

Application Forms and Templates

The following forms and templates may be used as part of the application submission. Note that these forms and templates do not necessarily constitute all the documents required for a complete application. Please refer to the 'Application and Submission Information' of the published announcement to learn more about the required application content requirements.

Full Application

  • Statement of Project Objectives (SOPO) (Last Updated: 1/26/2023 05:09 PM ET)
  • SF-424 Application for Federal Assistance (Last Updated: 1/31/2023 08:28 AM ET)
  • SF-LLL Disclosure of Lobbying Activities (Last Updated: 1/26/2023 05:10 PM ET)
  • Budget Justification (Last Updated: 1/31/2023 08:28 AM ET)

Submission Deadlines

  • Concept Paper Submission Deadline: 3/23/2023 5:00 PM ET
  • Full Application Submission Deadline: 5/17/2023 5:00 PM ET
  • View Full Application Reviewer Comments Period: 6/14/2023 5:00 PM ET – 6/20/2023 5:00 PM ET