Interested in learning about other DOE Funding Opportunities?

EERE Archived Funding Opportunities

Collapse Jump to a FOA:
 
FOA Number 
FOA Title 
Announcement
Type
 
Program 
LOI Deadline 
CP Deadline 
FA Deadline 
 
xv
xv
xv
xv
xv
  DE-FOA-0000836 Advanced Biomass Feedstock Logistics Systems II Funding Opportunity Announcement (FOA) Bioenergy Technologies (BETO) 2/15/2013 05:00 PM ET 3/22/2013 05:00 PM ET

DE-FOA-0000836: Advanced Biomass Feedstock Logistics Systems II

The lack of logistics systems capable of handling and delivering sufficiently high tonnage year-round volumes of high quality feedstocks to support the rapid escalation of cellulosic biofuels production has been identified as a significant barrier to the expansion of a sustainable domestic biofuels industry.  In particular, biomass physical and chemical quality parameters have repeatedly been identified as significant challenges to the smooth operation and economic viability of biorefineries.

This FOA will focus on developing and demonstrating strategies, equipment, and rapid analytical methods to manage feedstock quality within economic constraints throughout the feedstock supply chain.  The main effort in Proposals must be directed toward full-scale demonstration of integrated feedstock supply chain systems that can deliver the volume of high quality, affordable, high impact feedstocks required by commercial biorefineries over a significant geographic area in the United States.

DOE plans to support the increased production of high volumes of sustainably produced domestic biofuels from cellulosic feedstocks by seeking Proposals to design new systems or adapt existing systems to handle industrial scale volumes of cellulosic feedstocks from the harvest point to the throat of the biorefinery reactor.  

Documents

  • FULL TEXT: Advanced Biomass Feedstock Logistics Systems II (Last Updated: 1/17/2013 12:04 PM ET)

Previous Versions

  • SF-424 Application for Federal Assistance (Last Updated: 1/17/2013 12:21 PM ET)
  • SF-424A Budget Information (Last Updated: 1/17/2013 12:22 PM ET)
  • PMC 123.1 Budget Justification (Last Updated: 1/17/2013 12:24 PM ET)
  • Statement of Project Objectives (Last Updated: 1/17/2013 12:25 PM ET)
  • EF-1 Environmental Checklist (Last Updated: 1/17/2013 02:25 PM ET)
  • PMC 111.1 Environmental Questionnaire (Last Updated: 1/17/2013 02:26 PM ET)
  • SF-LLL Lobbying Form (Last Updated: 1/17/2013 12:25 PM ET)

Contact Information

Submission Deadlines

  • Concept Paper Submission Deadline: 2/15/2013 5:00 PM ET
  • Full Application Submission Deadline: 3/22/2013 5:00 PM ET