Interested in learning about other DOE Funding Opportunities?

EERE Archived Funding Opportunities

Collapse Jump to a FOA:
 
FOA Number 
FOA Title 
Announcement
Type
 
Program 
LOI Deadline 
CP Deadline 
FA Deadline 
 
xv
xv
xv
xv
xv
  DE-FOA-0002802 Bipartisan Infrastructure Law Section 40334: Pumped Storage Hydropower Wind and Solar Integration and System Reliability Initiative Funding Opportunity Announcement (FOA) Water Power Technologies (WPTO) 11/17/2022 05:00 PM ET 12/15/2022 05:00 PM ET

DE-FOA-0002802: Bipartisan Infrastructure Law Section 40334: Pumped Storage Hydropower Wind and Solar Integration and System Reliability Initiative

The Office of Energy Efficiency and Renewable Energy (EERE) is issuing, on behalf of the Water Power Technlogies Office (WPTO), this Funding Opportunity Announcement (FOA) titled “Bipartisan Infrastructure Law Section 40334: Pumped Storage Hydropower Wind and Solar Integration and System Reliability Initiative.” Awards made under this FOA will be funded, in whole or in part, with funds appropriated by the Infrastructure Investment and Jobs Act, more commonly known as the Bipartisan Infrastructure Law (BIL).

Through this FOA, DOE will invest $10 million to carry out project design, transmission studies, power market assessments, and permitting for a pumped storage hydropower (PSH) project to facilitate the long-duration storage of intermittent renewable electricity. Eligibility for this FOA is limited to projects that have received a FERC preliminary permit, and are working toward licensing a PSH project with at least 1000 MW capacity that can participate in multiple markets and store intermittent renewable energy generated on tribal lands.

Documents

  • DE-FOA0002802_Pumped_Storage_Hydropower (Last Updated: 10/18/2022 02:10 PM ET)
  • Q&A Spreadsheet for DE-FOA-0002802 (updated 12/15/2022) (Last Updated: 12/15/2022 02:52 PM ET)
  • Teaming Partner List 11.23.22 (Last Updated: 11/23/2022 03:21 PM ET)

Application Forms and Templates

The following forms and templates may be used as part of the application submission. Note that these forms and templates do not necessarily constitute all the documents required for a complete application. Please refer to the 'Application and Submission Information' of the published announcement to learn more about the required application content requirements.

Full Application

  • Statement of Project Objectives (Last Updated: 10/12/2022 02:17 PM ET)
  • Budget Justification (Last Updated: 10/12/2022 02:18 PM ET)
  • SF-LLL (Last Updated: 10/12/2022 02:19 PM ET)
  • SF-424 Application (Last Updated: 12/21/2022 10:33 AM ET)
  • Summary Slide (Last Updated: 10/12/2022 02:20 PM ET)

Submission Deadlines

  • Letter of Intent Deadline: 11/17/2022 5:00 PM ET
  • Full Application Submission Deadline: 12/15/2022 5:00 PM ET
  • View Full Application Reviewer Comments Period: 1/30/2023 5:00 AM ET – 2/3/2023 5:00 PM ET